Home Glossary Guest List Contact Us Log In    
 Imagery
For best results, please use:
  IE 5+
  Firefox 1+
  Netscape 7+
Site Statistics:
Monitoring Site Browser
Select a program or network:
Select a monitoring site:
Acadia NP             Topographic Map    
SiteCode: ACAD1
SiteName: Acadia NP
State: ME
StateFIPS: 23
CountyFIPS: 009
Latitude: 44.3771
Longitude: -68.261
ElevationMSL: 157.3333
StartDate: 3/2/1988
EndDate:
Status:
AirsSiteCode: 230090103
LandUseCode: Unknown
LocationCode: Unknown
ObjectiveCode: Unknown
TopographyCode: Coastal
MSACode:
EPARegion:
ImproveRegionID: 15
AQCRID: 0
CMSAID: 0
AirBasinID: 0
UrbanAreaID: 0
AgencyID: 1648
StreetAddress:
LocDesc: Park Headquarters
City:
ZipCode:
Comment:
UTMZone:
UTMEasting:
UTMNorthing:
DistanceToCity:
ProgramCode: IMPROVE
NativeSiteCode: ACAD1
Sponsor: NPS
InfoSource:
ModDate: 4/22/2005
ModBy: ljd
ModComments: Coordinates and sponsor updated to reflect update of offical coordinates from Davis
NW HyperLink     HyperLinkN HyperLink     HyperLink NE
HyperLink
HyperLink
   
   
HyperLink
W
HyperLink
HyperLink
E
HyperLink
   
   
HyperLink HyperLink
SW HyperLink     HyperLink  S HyperLink     HyperLink SE
Looking North towards the site. (ACAD1_2005_N_IN.JPG)
Method History
8/26/1996Added glycerin to Module B1 denuder
6/28/1994Changed nylon filter size from 47mm diameter to 25mm (17.4 to 4.9 sq cm)
Change History
4/27/2006C1 Module pump replaced
9/22/2005A1 B1 C1 D1 Modules Flow Calibration
9/22/2005Routine annual maintenance
7/14/2005B1 Module pump replaced
7/12/2005Forest fires both local and regional
6/21/2005Prescribed fire in the area
4/5/2005B1 Module pump replaced
2/8/2005B1 Module pump replaced
7/24/2004A1 Module Flow Calibration
7/24/2004B1 Module Flow Calibration
7/24/2004C1 Module Flow Calibration
7/24/2004D1 Module Flow Calibration
7/24/2004Photos Taken
7/24/2004Routine annual maintenance
7/8/2004A1 Module Electronic Box replaced
5/7/2004A1 Module Electronic Box replaced
5/4/2004B1 Module electronic box replaced
4/2/2004A1 Module pump Replaced
2/14/2004Ice on Module D1 filter cartridge, used heat gun to free up
2/11/2004Ice on Module D1 filter cartridge, used heat gun to free up
12/19/2003Sampler controller replaced
8/29/2003A1 Module Flow Calibration
8/29/2003B1 Module Flow Calibration
8/29/2003C1 Module Flow Calibration
8/29/2003C1 Module pumps replaced
8/29/2003D1 Module Flow Calibration
8/29/2003D1 Module pumps replaced
8/29/2003Photos Taken
8/29/2003Routine annual maintenance
9/11/2002A1 Module Flow Calibration
9/11/2002A1 Module pump replaced
9/11/2002B1 Module Flow Calibration
9/11/2002B1 Module pumps replaced
9/11/2002C1 Module Flow Calibration
9/11/2002D1 Module Flow Calibration
9/11/2002Photos Taken
9/11/2002Routine annual maintenance
8/1/2002D1 Module pump Replaced
5/17/2002D1 Module pump Replaced
4/11/2002Fires and construction 25 miles from the shelter
3/5/2002B1 Module electronic box and cyclone replaced
10/4/2001Fires 7 miles SW of site
9/30/2001A1 Module Flow Calibration
9/30/2001B1 Module Flow Calibration
9/30/2001C1 Module Flow Calibration
9/30/2001D1 Module Flow Calibration
9/30/2001Photos Taken
9/30/2001Routine annual maintenance
5/14/2001Sampler controller replaced
10/26/2000B1 Module electronics box replaced
9/20/2000A1 Module Flow Calibration
9/20/2000B1 Module Flow Calibration
9/20/2000C1 Module Flow Calibration
9/20/2000D1 Module Flow Calibration
7/15/2000Painting around the sampler occurred
5/23/2000C1 Module Flow Calibration
5/23/2000D1 Module Flow Calibration
5/23/2000Version 2 sampler installed
5/23/2000A1 Module Flow Calibration
5/23/2000B1 Module Flow Calibration
5/23/2000Version 2 IMPROVE sampler installed
1/1/2000Many visitors in park
9/1/1999D1 Module Flow Calibration
6/23/1999Some painting done around shed
10/29/1998ACAD1 built new shelter on original site
10/16/1998B1 Module Flow Calibration
10/16/1998C1 Module Flow Calibration
10/16/1998D1 Module Flow Calibration
10/16/1998Routine annual maintenance
10/16/1998A1 Module Flow Calibration
5/13/1998Shelter painted
4/22/1998Road work within 25 feet of shelter
10/7/1997A1 Module Flow Calibration
10/7/1997B1 Module Flow Calibration
10/7/1997C1 Module Flow Calibration
10/7/1997D1 Module Flow Calibration
10/7/1997Routine annual maintenance
6/10/1997Smoke from fires in area
8/26/1996B1 Module Flow Calibration
8/26/1996C1 Module Flow Calibration
8/26/1996D1 Module Flow Calibration
8/26/1996Routine annual maintenance
8/26/1996A1 Module Flow Calibration
8/24/1995A1 Module Flow Calibration
8/24/1995B1 Module Flow Calibration
8/24/1995C1 Module Flow Calibration
8/24/1995D1 Module Flow Calibration
8/24/1995Routine annual maintenance
8/23/1995Smoke from fires in area
4/26/1995A1 Module area increased from 2.20 to 3.53 sq cm
8/18/1994A1 Module Flow Calibration
8/18/1994A1 Module pump replaced
8/18/1994B1 Module Flow Calibration
8/18/1994B1 Module pump replaced
8/18/1994C1 Module Flow Calibration
8/18/1994C1 Module pump replaced
8/18/1994D1 Module Flow Calibration
8/18/1994D1 Module pump replaced
8/18/1994Routine annual maintenance
8/18/1994Site moved inside about 150 yards from old stand
8/18/1994Moved ACAD1 from outdoors to indoors 150 yards
4/15/1993Routine annual maintenance
Program History
1/1/2005Changed carbon analysis instrument from DRI/OGC to Model 2001 Thermal/Optical Carbon Analyzer. Changed analysis protocol from IMPROVE to IMPROVE_A.
1/1/2004Changed module B filter supplier from Osmonics to Pall-Gelman
10/1/2002Standardized XRF run times at 1000 seconds
6/1/2002Changed from quarterly to monthly medians to estimate artifact corrections from field blanks and secondary filters
12/1/2001Analysis of elements with atomic weights from Na to Mn was changed from PIXE to XRF by Cu anode.
4/5/2001Ion samples extracted using DI water at all sites
10/11/2000Ion samples extracted using anion eluent at all sites except GRSM1, SHEN1, and DOSO1 where extraction is with DI water.
1/28/1999Ion samples extracted using DI water at all sites
6/1/1997Ion samples extracted using DI water at GRSM1, SHEN1, DOSO1. All other sites extracted with anion eluent.
10/1/1996Changed nylon filter manufactures from Gleman to MSI
6/1/1996Added glycerin to Module B denuder (NEED TO GET SITE SPECIFIC DATES!!)
5/23/1995Ion analysis switched to Research Triangle Institute (RTI). Ion samples extracted using anion eluent.
4/19/1995Module A filter area changed from 2.2 sq. cm to 3.5 sq. cm
6/28/1994Changed nylon filter size from 47mm diameter to 25mm (NEED TO GET SITE SPECIFIC DATES!!)
3/1/1994Optical absorption measurement changed from Laser Integrating Plate Method (LIPM) to Hybrid Integrating Plate/Sphere Analysis (HIPS).
6/1/1992Analysis of elements with atomic weights from Fe to Pb was changed from PIXE to XRF by Mo anode, decreasing their minimum detection limits (MDL). The cyclotron time for the PIXE analysis was reduced increasing the MDLs for elements below FE.
9/15/1990Ion analysis contractor switched from Research Triangle Institute (RTI) to Global Geochemistry Company (GGC). Ion samples extracted using anion eluent.